John Connell Clearing Permit

PUBLIC SUBMISSION: OBJECTION TO CLEARING PERMIT AMENDMENT APPLICATION CPS 10237/2

Submitted to: Native Vegetation Regulation, Department of Water and Environmental Regulation (DWER)
Submitted by: Melville Shadow Council (MSC)
Date: [Insert Date prior to 25 November 2026]

APPLICATION DETAILS

AttributeReference / Specification
Permit NumberCPS 10237/2 (Amendment to Area Permit CPS 10237/1 – Extension of Time)
ApplicantLeeming Spartan Cricket Club Inc (on behalf of the City of Melville)
Subject LandLot 753 on Deposited Plan 220336, Lot 300 on Deposited Plan 301022, and Unnamed Road Reserve (Clifton Road) (PIN 1184386), Leeming
Clearing Footprint & Purpose0.68 hectares of native vegetation for recreation as a playing field and public open space
Statutory ContextSection 51O of the Environmental Protection Act 1986 (WA)

1. ORGANIZATIONAL STANDING & CORE OBJECTION

The Melville Shadow Council (MSC) is an independent, non-partisan civic policy think tank auditing Western Australian local government compliance, statutory frameworks, and risk management. MSC formally objects to granting an extension of time for Clearing Permit CPS 10237/2.

Under Section 51O of the Environmental Protection Act 1986 (WA), DWER must evaluate clearing principles alongside the compliance track record and operational capacity of the overarching land manager. Although the Leeming Spartan Cricket Club Inc is the nominal permit holder, the City of Melville controls the land, capital funding, and execution of the mandatory 7.34-hectare offset and revegetation conditions at Ken Hurst Park. Granting an extension rewards systemic municipal procrastination while relying on regulatory assumptions that DWER’s own Contaminated Sites records and MSC’s empirical audits prove are structurally broken.

2. DIVERSIONARY USE OF OVERSIGHT ARCHITECTURE & REGULATORY BLIND SPOTS

As documented in MSC’s 6-part thesis, Impotence of Oversight Architecture in Local Government, local government administrations routinely deflect ratepayer scrutiny into fragmented, siloed State watchdogs to create an illusion of external accountability while masking internal operational incompetence:

  • The “Dual-Hat” Co-Regulation Conflict (Part III – Merits, Safeguards, and Operational Disconnects): Under the Environmental Protection Act 1986 and the Contaminated Sites Act 2003, DWER relies on local governments as frontline co-regulators. However, municipal Environmental Health Officers (EHOs) and environmental staff are directly subordinate to the CEO’s employment monopoly. As MSC’s audit demonstrates, this creates an acute “dual-hat” conflict where localized officers cannot independently enforce contamination, pathogen, or clearing compliance against their own employer. When DWER grants an extended permit window without independent third-party verification, it relies on self-policing by the very bureaucracy responsible for the delays.
  • The Procedural Correctness Trap & Siloed Watchdogs (Parts II & IV): When residents raise alarms over environmental delays or governance breaches, the City’s default practice is to invite referrals to agencies such as the Department of Local Government, Sport and Cultural Industries (DLGSC), the Public Sector Commission (PSC), or the WA Ombudsman. Because these agencies operate in rigid statutory silos—evaluating only whether paperwork appears technically complete on its face—they remain blind to underlying operational neglect. Referring critics to fragmented watchdogs allows the City to claim “procedural compliance” while leaving substantive ecological degradation unaddressed.
  • Information Gatekeeping & Asymmetry (Parts I & VI): Under the Local Government Act 1995 (WA), executive administrations control the curation of officer reports and Freedom of Information (FOI) releases. By positioning a third-party sporting club as the permit applicant, the City establishes an additional administrative buffer that insulates its executive directors from direct statutory accountability when project milestones slip.

3. SPECIFIC CITY OF MELVILLE INADEQUACIES THREATENING PERMIT OFFSET CONDITIONS

DWER’s own regulatory history and MSC’s empirical case studies—specifically Environmental Mismanagement, Failure to Document and Publish, and Policy Failure & Systemic Obfuscation—identify five concrete operational failures that directly threaten the success of the CPS 10237/1 offset conditions at Ken Hurst Park:

  1. Over 13 Years of Unmanaged Non-Compliance with DWER’s 2013 Contaminated Sites Classification: In 2013, DWER formally classified the former Dundee Road Landfill (1974–2000) within John Connell Reserve as “Contaminated – Remediation Required” under the Contaminated Sites Act 2003 due to buried domestic waste, heavy metals, and asbestos-containing materials (ACM) beneath a degraded or non-existent topsoil cap. More than a decade later, the City has still failed to execute full site remediation—instead deferring action behind repeated “master planning” cycles while using portions of the un-remediated site to store waste and infrastructure materials. Worse, rather than rehabilitating this degraded landfill footprint to accommodate expanded playing fields, the City is electing to clear intact Threatened Ecological Community (TEC) Banksia Woodland. An administration that has left a binding DWER remediation directive unmanaged on this exact reserve for over 13 years cannot be relied upon to execute time-sensitive, multi-year ecological offsets at Ken Hurst Park.
  2. Chronic Capital Scheduling Failure at John Connell Reserve: Public chronologies on the City’s John Connell Reserve Master Plan page confirm that despite initial concepts dating back over a decade and the original clearing permit being granted in July 2025, the City still failed to schedule construction until the 2027/28 financial year. Granting an extension simply accommodates internal municipal project management failure.
  3. Uncontained Phytophthora Dieback Within the Offset Site: The City’s own Biosecurity disclosures confirm Phytophthora cinnamomi (dieback) is already established across at least 21 bushland reserves, explicitly including Ken Hurst Park. Extending the clearing timeframe prolongs soil disturbance and heavy machinery staging adjacent to an infected regional park, elevating the risk of cross-contamination that will compromise the required 70% seedling survival rate in the offset area.
  4. Systematic Marginalisation of Community Conservation Volunteers: While the City’s Weed Management model relies heavily on broadacre winter herbicide spraying supplemented by unpaid community “Friends of” groups, MSC’s governance audits expose a documented pattern of excluding, failing to coordinate, and marginalising local conservation volunteers. Without active, supported local stewardship and transparent reserve-level management procedures (which remain unpublished contrary to Section 5.41(2)(c) of the Local Government Act 1995), long-term weed suppression and revegetation maintenance at Ken Hurst Park face severe execution risk.
  5. Fragmented Environmental Policy & Post-Approval Scope Drift: As detailed in MSC’s policy audit, the City maintains urban canopy, tree retention, and bushland policies in disconnected silos without cohesive cross-referencing. This structural fragmentation was evident in the City’s May 2026 Ordinary Council Meeting outcome, where Council resolved to explore alternative revegetation locations and tree-transplanting feasibility after the original permit had already been granted. Granting an extension enables further ad-hoc scope drift rather than enforcing strict compliance with original ecological conditions.

4. CONCLUSION & RELIEF SOUGHT

DWER cannot safely assume that standard municipal governance or external watchdog oversight will guarantee compliance with extended clearing and offset timelines—particularly when the City of Melville has left DWER’s own 2013 Contaminated – Remediation Required classification on John Connell Reserve unmanaged for over a decade.

To protect the ecological integrity of Ken Hurst Park and enforce statutory accountability, the Melville Shadow Council formally requests that DWER:

  1. Refuse the application for an extension of time under CPS 10237/2; and
  2. Require that if clearing beyond July 2027 is pursued, the City of Melville must apply directly in its own name, supported by:
    • Updated Black Cockatoo habitat surveys;
    • Verified completion of the 2013 Dundee Road Landfill remediation obligations;
    • Independent Phytophthora hygiene verification; and
    • Enforceable third-party audits of all offset survival milestones.

SUBMITTER AUTHORIZATION & CONTACT DETAILS

  • Organization: Melville Shadow Council
  • Authorized Representative: Gavin Waugh (FSIA), Lead Advocate
  • Email: melville.shadowcouncil@outlook.com
  • Telephone: +61 409 295 781
  • Website: melvilleshadowcouncil.org

Next Steps:

To audit the specific public sector codes, statutory data points, and administrative authorities cited across this document, explore our centralized Academic References Directory.